Shetland Wind Power Ltd offer complete installed turbine packages for the following general costs, all taking into account relevant grants:
2.5 kW –
6 kW –
15 kW –
The values will vary depending on a number of factors including: system requirements and site characteristics
Payback periods of four to five years are easily achievable on each package, with high monetary savings thereafter.
Typical lifespan of each turbine is in excess of 20 years, requiring only routine servicing.
Please refer back to this page to view typical economic information surrounding our turbine installations, including all costs, payback and economic benefits
Information on grants can be found at the following links:
Low Carbon Buildings Programme from the DTI
Energy Savings Trust
Scottish Community and Householder Renewables Initiative (SCHRI)
|